SARACon has performed Regulatory Safety in the following areas:
-
Risk Based Performance Indicators - Developed
methods and information processes for (RBPIs), part of NRC’s
revised Reactor Oversight Process.
-
Safety Analyses for the Preliminary Safety Analysis
Report - Plan, Perform and Document (PSAR) at DOE’s
Nuclear Waste Vitrification Plant (WTP) at Hanford
-
unreviewed Safety Issues - Supported many applications
in the Private, Government and Public sectors of the nuclear
industry for the analysis, resolution and documentation of unreviewed
safety issues (Safety Evaluations)
-
NRC 50.59 requirements – Implemented
programmatic changes in chemistry and radiation protection procedures
and process documentation to respond to latest NRC 50.59 requirements
of NEI-96-7/R1
-
Operational Readiness Reviews (ORR) –
Supported various facilities in preparation for ORR and participated
in ORR evaluations
-
RCRA/TSCA Permit Applications – Supported
various aspects of RCRA/TSCA Permit Applications and Trial Burn
Preparation including Startup and throughput challenges. {Licensing Capabilities}
|
| Industries We Service Using Regulatory Safety |
| |
Within
these broad areas of expertise, SARACon's professional consultants
pride themselves in their demonstrated ability to develop and
guide the implementation of strategies which can enhance both
safety and productivity improvement, limit corporate liabilities,
and manage externally induced risks throughout the following industries:
|
|
|
©